World Cargo Logistics
COMPLIANCE

WPC License

Wireless Planning Commission ETA certification

WPC ETA for wireless devices (mobile phones, RF equipment, IoT, drones) — application, dossier preparation, follow-through to grant.

WPC ETA (Equipment Type Approval) from the Wireless Planning & Coordination wing of the Department of Telecommunications is mandatory for any wireless device imported into or sold in India — mobile phones, RF equipment, IoT devices, drones, walkie-talkies, RFID readers, Bluetooth modules, Wi-Fi routers. Without WPC ETA, customs holds the consignment indefinitely.

WCL's compliance desk files WPC ETA applications end-to-end — dossier preparation, technical documentation, test report compilation (FCC/ETSI/IEC), submission to the WPC portal, follow-up at the regional office, and grant. Typical timeline 6-12 weeks, depending on the equipment class and test report completeness.

Particular depth in mobile phone / smartwatch / Bluetooth audio product approvals, drone / UAV WPC clearance under the Drone Rules 2021, and industrial RFID / IoT module approvals where the customer is importing a small batch and doesn't want to set up a global compliance team.

What we handle

Everything we cover for WPC License

WPC ETA application preparation — full technical dossier
Test report compilation — FCC / ETSI / IEC reports cross-referenced
Dossier submission via WPC portal
Follow-up at WPC regional office (Delhi / Mumbai)
Drone / UAV WPC clearance under Drone Rules 2021
Frequency band coordination (where multiple bands need separate ETAs)
Annual return filing post-grant
How it works

Our process — step by step

01

Equipment classification

We classify the equipment per WPC categories — Cellular, Wi-Fi, Bluetooth, Zigbee, LoRa, Drone (Civil), etc. Each category has different documentation requirements.

02

Test report compilation

We collate FCC, ETSI, IEC, or other internationally-recognised test reports. Where reports are missing, we coordinate with WPC-empanelled Indian test labs.

03

Application filing

Application submitted via the WPC portal with technical dossier, test reports, manufacturer details.

04

Query response & grant

WPC raises technical queries (2-3 cycles typical). We respond with supplementary data. ETA granted typically 6-12 weeks from filing.

05

Customs clearance integration

Once ETA is granted, the certificate is uploaded to e-Sanchit. Cargo (held at port) is now clearable on the next BoE.

Why WCL

Why exporters / importers pick us for WPC License

  • WPC desk has filed 100+ applications across mobile / IoT / drone categories
  • Direct WPC officer relationships in Delhi & Mumbai for query response
  • Combined CHA + WPC = we hold the cargo at customs until WPC is granted (so duty isn't paid prematurely)
  • Transparent fee — flat application fee + government fee (no percentage commission)
Documents

What we'll typically need

Application form (WPC portal)Technical specification sheetFCC / ETSI / IEC test reportsEquipment photographs (all 6 sides)Manufacturer authorisation letterCompany KYC (GST, IEC, Memorandum)
Frequently asked questions

Questions clients ask us about WPC License

What devices need WPC ETA?

Any device transmitting on a regulated frequency band — Cellular, Wi-Fi, Bluetooth, Zigbee, NFC, LoRa, GPS, drones with RF, smart watches, Bluetooth speakers, IoT modules. Even devices that only RECEIVE in some bands may need ETA. Tell us the device and we'll classify.

How long does WPC ETA take?

6-12 weeks from filing for most categories. Mobile phones: typically 8-10 weeks. Drones: 6-8 weeks (faster post-Drone Rules 2021). IoT modules with international test reports already in place: 4-6 weeks possible.

Can I import the cargo BEFORE WPC ETA is granted?

Yes — cargo can be imported and held in customs warehouse / bonded warehouse pending WPC grant. We coordinate the bonded storage so cargo doesn't accrue port demurrage.

What's the WPC fee structure?

Government fee: INR 10,000 per ETA application for most categories (INR 50,000+ for some high-power categories). WCL filing fee: flat per application, quoted upfront. Total typically INR 15,000-50,000 depending on device class.

Ready to move on this?

Tell us the shipment specifics — we'll turn around a binding quote in under 4 working hours.